Equipment for the installation of pile foundations. Depth is up to 9.5 m.
Initial acceleration is 1.8 times stronger , therefore impact energy is higher.
Equipment for the installation of pile foundations. Depth is up to 9.5 m.
Initial acceleration is 1.8 times stronger , therefore impact energy is higher.
6 items of equipment for drilling of wells in any terrain.
Installation is possible on your vehicle or on chain tracks.
Manufactured with innovative solutions to achieve higher performance.
Development of a technological solution for the set goal, design, production, testing, delivery.
Since 2013, we have firmly established ourselves in the production of piling machines and drilling rigs.
The company “Baumatik” is the founder of this of production.
We train construction companies to do business on the equipment manufactured by us.