Piling services for commercial and civil building

  • We install piles which profile is up to 350 millimeters and of the length up to 9 meters
  • The speed of piling is up to 40 units per 8 hours
  • The price is from 270 roubles for a meter

6 key advantages of the BAUMATIK technology

  • Bearing capacity of one pile is from 50 tonnes (depending on the type of soil) Bearing capacity of one pile is from 50 tonnes (depending on the type of soil)
  • Resistance to soil heaving as piles are installed deeper than frost level Resistance to soil heaving as piles are installed deeper than frost level
  • Construction can begin on the day of Foundation construction. Construction can begin on the day of Foundation construction.
  • Reinforced concrete piles are produced according to the norms, all certificates are provided Reinforced concrete piles are produced according to the norms, all certificates are provided
  • Water resistance of piles, ground waters will not damage the piling foundation Water resistance of piles, ground waters will not damage the piling foundation
  • Piles of high-resistance, stones in soil do not prevent from installment Piles of high-resistance, stones in soil do not prevent from installment
6 key advantages of the BAUMATIK technology
BAUMATIK technology

BAUMATIK technology

Piles are produced according to the existing standards. They are driven into the ground using a pile driver.  Equipment functions from -40 to +30 degrees Celsius. It can move independently in mud, on boggy and marshy ground, snow.

The accuracy of installment is set in automatic mode.
A system of a 3D self-leveling in real-time mode controls deviations from acceptable value during the drilling, so the defects are excluded.

The technology provides a strict minimum of concealed works, that is why the process can be easily controlled. It fully corresponds to the existing standards.

Procedure for the provision of services

01
Request

for piling installment. Manager counts the price of services, send you a Price quote. We sign a treaty.

02
Sending piling equipment

to the ground.

03
Preliminary works:

 arrangement of piling mechanisms access and the ways of transportation of piling equipment

04
Geodesic

survey

05
Pile drilling

according to the survey

06
Acceptance:

After the works are executed a client receives all the documentation needed: acceptance sheet, journal of pile installment etc.

Why it is profitable to order pile in our company

More than 10 years of experience:
More than 10 years of experience:

irreprochable knowledge of the unique technology and of the rules of operation of machines on complicated soils

Machines of our own production,
Machines of our own production,

so the price is cheaper than all other company can effort

5 groups of experienced specialists,
5 groups of experienced specialists,

possibility to execute an order in a short time

We dispose of piling equipment
We dispose of piling equipment

for the tasks of any level of complexity